|
Vernon is currently bidding remediation work at the former Daniel's Mill in Downtown Rockville!
An RFP was issued in July for the remediation of hazardous materials inside the mill at 98 East Main Street in Rockville. HAZMAT materials include (but aren't limited too) PCBs, Asbestos, and other VOCs. A walkthrough was held this morning at the site for bidders to tour and look through the space. 29 different contractors were on-site according to the sign-in sheet. Abatement is just the first step in the eventual redevelopment of the site. The town purchased/took control of the building in 2021. The town has received over $4 million in grant towards the remediation of the site. The mill is expected to be redeveloped along with the Amerbelle and Anacoil Mills (the Rockville Mill Complex) as a gateway to Downtown Vernon. The site would be a mixed-use project consisting of 200 residential units (110,000 sq. ft.) and 20,000 sq. ft. of commercial, brewpub/restaurant and event space according to reporting from 2022. The documents are open for public viewing here: https://www.vernon-ct.gov/o/tov/page/bids-and-rfps
0 Comments
Leave a Reply. |
Towns |
Company |
|
RSS Feed